Skip to content

AD 2024-06419

Published 2024-03-27 · 2 models · 2 US-registered tails affected · Federal Register

Airworthiness Directives; International Aero Engines, LLC Engines Federal Register ↗

Abstract

The FAA is superseding Airworthiness Directive (AD) 2022-19-15 for certain International Aero Engines, LLC (IAE LLC) Model PW1100G series engines; and AD 2023-16-07 for certain IAE LLC Model PW1100G series engines and PW1400G series engines. AD 2022-19-15 required an angled ultrasonic inspection (AUSI) of the high-pressure turbine (HPT) 1st-stage disk and HPT 2nd-stage disk, and replacement, if necessary. AD 2023-16-07 required an AUSI of the HPT 1st-stage hub (also known as the HPT 1st-stage disk) and HPT 2nd-stage hub (also known as the HPT 2nd-stage disk) for cracks, and replacement, if necessary, which is terminating action for AD 2022-19-15. This AD was prompted by an investigation that determined an increased risk of powdered metal anomalies for all powdered metal parts in certain powdered metal production campaigns, which are susceptible to failure significantly earlier than previously determined. This AD retains the AUSI requirement for certain HPT 1st-stage and HPT 2nd-stage hubs from AD 2023-16-07. This AD requires performing an AUSI of the HPT 1st-stage hub, HPT 2nd-stage hub, high-pressure compressor (HPC) 7th-stage integrally bladed rotor (IBR-7), and HPC 8th-stage integrally bladed rotor (IBR-8) for cracks, and replacing if necessary. This AD also requires accelerated replacement of the HPC IBR-7, HPC IBR-8, HPC rear hub, HPT 1st-stage hub, and HPT 2nd-stage hub. The FAA is issuing this AD to address the unsafe condition on these products.

Applicability · by US fleet size

  • FLEET 80 1 tails
  • STANDARD E-1 1 tails

Federal Register text

Verbatim; the Federal Register publication is the legally binding document. Cite: 89 FR 21181. View on Federal Register ↗

[Federal Register Volume 89, Number 60 (Wednesday, March 27, 2024)] [Rules and Regulations] [Pages 21181-21190] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2024-06419]

-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. FAA-2023-2401; Project Identifier AD-2023-01278-E; Amendment 39-22703; AD 2024-05-11] RIN 2120-AA64

Airworthiness Directives; International Aero Engines, LLC Engines

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2022-19-15 for certain International Aero Engines, LLC (IAE LLC) Model PW1100G series engines; and AD 2023-16-07 for certain IAE LLC Model PW1100G series engines and PW1400G series engines. AD 2022-19-15 required an angled ultrasonic inspection (AUSI) of the high-pressure turbine (HPT) 1st-stage disk and HPT 2nd-stage disk, and replacement, if necessary. AD 2023-16-07 required an AUSI of the HPT 1st-stage hub (also known as the HPT 1st-stage disk) and HPT 2nd-stage hub (also known as the HPT 2nd-stage disk) for cracks, and replacement, if necessary, which is terminating action for AD 2022-19-15. This AD was prompted by an investigation that determined an increased risk of powdered metal anomalies for all powdered metal parts in certain powdered metal production campaigns, which are susceptible to failure significantly earlier than previously determined. This AD retains the AUSI requirement for certain HPT 1st-stage and HPT 2nd-stage hubs from AD 2023-16-07. This AD requires performing an AUSI of the HPT 1st-stage hub, HPT 2nd-stage hub, high-pressure compressor (HPC) 7th-stage integrally bladed rotor (IBR-7), and HPC 8th-stage integrally bladed rotor (IBR-8) for cracks, and replacing if necessary. This AD also requires accelerated replacement of the HPC IBR-7, HPC IBR-8, HPC rear hub, HPT 1st-stage hub, and HPT 2nd-stage hub. The FAA is issuing this AD to address the unsafe condition on these products.

DATES: This AD is effective April 11, 2024. The Director of the Federal Register approved the incorporation by reference of certain publications listed in this AD as of April 11, 2024. The Director of the Federal Register approved the incorporation by reference of a certain other publication listed in this AD as of August 28, 2023 (88 FR 56999, August 22, 2023). The Director of the Federal Register approved the incorporation by reference of a certain other publication listed in this AD as of November 7, 2022 (87 FR 59660, October 3, 2022; corrected October 24, 2022 (87 FR 64156)).