Skip to content

Atlas/ Glossary/ LOST LINK PROCEDURE

General

LOST LINK PROCEDURE.

LOST LINK PROCEDURE

- Preprogrammed or predetermined mitigations to ensure the continued safe operation of the UA in the event of a lost link (LL). In the event positive link cannot be established, flight termination must be implemented.