ATL98LA118
1998-08-20 · GREENVILLE, North Carolina, United States · None · 1 aircraft · Status: Completed
Airport PGV
Aircraft involved
Probable cause & findings
A loose wiring connection at the landing gear motor relay that prevented the electrical extension of the landing gear.
Factual narrative
On August 20, 1998, about 1328 eastern daylight time, a Piper PA-30, N7298Y, collapsed the landing gear on touchdown at the Pitt-Greenville Airport, Greenville, North Carolina. The airplane was operated by Carolina Aerial Mapping Service, Inc., under the provisions of Title 14 CFR Part 91, and visual flight rules. Visual meteorological conditions prevailed at the time of the accident. A flight plan was not filed for the aerial photographic flight. There were no injuries to the airline transport pilot or the photographer, and the airplane was substantially damaged. Origination of the flight was Greenville, North Carolina, about 1105, on the same day. The pilot reported that at 1300, they had completed the photo mission and were returning to Greenville. When the flight was within 10 miles of the airport, the pilot initiated a descend from 8000 feet. To facilitate the descent, the pilot elected to lowered the landing gear. When he placed the landing gear handle in the down position, there was no response, and there were no indicators that confirmed that the landing gear had extended. After several attempts to lower the landing gear, the pilot rechecked the procedures by using the normal and the emergency checklist. Throughout the emergency, the pilot was in radio contact with the Fixed Base Operator (FBO). The FBO provide technical assistance to the pilot. Once the pilot realized that his efforts, to lower the landing gear, were not yielding positive results, he elected to execute a gear-up landing. The pilot established an approach for a gear-up landing on runway 07. The airplane touched down and stopped on the runway. Emergency equipment was also available for the landing. Examination of the landing gear assembly revealed that the efforts of the pilot had achieved a partial extension of the main landing gear. Further examination of the airplane disclosed that the landing gear motor solenoid control wire had an intermittent terminal connection under the rubber insulation boot on the solenoid. According to the maintenance manual, this condition would not allow the solenoid to close and run the landing gear motor. The pilot reported that at 1300, they had completed the photo mission and were returning home. When the flight was within 10 miles of the airport, the pilot initiated a letdown from 8000 feet. To facilitate the descent, the pilot elected to lowered the landing gear. When he placed the gear handle in the down position there was no response. Several attempts by the pilot to lower the landing gear, failed. Once the pilot realized that efforts to lower the landing gear were not yielding positive results, he elected to execute a gear-up landing. The airplane touched down and stopped on the runway. Emergency equipment was also available for the landing. Examination of the airplane disclosed that the landing gear motor solenoid control wire had an intermittent terminal connection under the rubber insulation boot on the solenoid. According to the maintenance manual, this condition would not allow the solenoid to close and run the landing gear motor. Source: NTSB Aviation Accident Database (Pre-2008 Archive) Retrieved: 2026-02-12
Verbatim from NTSB's published report. Source file
NTSB_1998_ATL98LA118.txt.
Findings + structured fields enriched from FAA avall.mdb.
Full investigation docket on
data.ntsb.gov ↗.
Search this event elsewhere
External sources are reported, not agency: signal that something happened, not fact about what happened.
- TallyAero Live Wire Aviation press
- NTSB CAROL Agency ↗
- NTSB Docket Agency ↗
- Aviation Safety Network Aviation press ↗
- Kathryn's Report Aviation press ↗
- Aviation Herald Aviation press ↗
- AVweb Aviation press ↗
- Pilots of America Community ↗
- Reddit /r/flying Community ↗
- FlightAware Aviation press ↗
- AOPA accident database Aviation press ↗
- Google News News ↗
- DuckDuckGo News ↗
Related research
Matched on aircraft type or causal vocabulary (maintenance). All research papers
- Embry-Riddle Scholarly Commons 2026 · Journal article (IJAAA) From Reactive to Predictive: A hybrid Trust-Mediated Adoption Framework for Data-Driven Maintenance in Distributed-Authority Aviation Environments
Modern aviation maintenance operates within increasingly data-intensive technological environments, yet the operational integration of predictive maintenance into routine decision-making remains incon…
- Semantic Scholar 2026 · Article (Reliability Engineering & System Safety) Understanding human error in military aviation maintenance: The role of Performance shaping factors, cognitive workload and error orientation
- Semantic Scholar 2025 · Article (Applied Sciences) Decision-Making Framework for Aviation Safety in Predictive Maintenance Strategies
The implementation of predictive maintenance (PM) in aviation presents unique challenges due to strict safety requirements, complex operational environments, and regulatory constraints.
- Semantic Scholar 2024 · Article (Defence Science Journal) Modelling of Human Factors in Aviation Maintenance Using HFACS ME Human Factors Analysis and Classification System Maintenance Extension and Bayesian Network
Aircraft maintenance is a complex task involving a skilled human workforce, spare parts, and various other resources. Human factors are an inherent element of the human workforce.
- Embry-Riddle Scholarly Commons 2024 · Journal article (JAAER) A New Trajectory in UAV Safety: Leveraging Reinforcement Learning for Distance Maintenance Under Wind Variations
In the field of aviation, safety is a critical cornerstone, and the operation of Unmanned Aerial Vehicle (UAV) systems is deeply connected with this principle.
- Embry-Riddle Scholarly Commons 2024 · Journal article (JAAER) Low-Resource Automatic Speech Recognition Domain Adaptation – A Case-Study in Aviation Maintenance
With timeliness and efficiency being critical in the aviation maintenance industry, the need has been growing for smart technological solutions that optimize and streamline the different underlying ta…