CEN15LA156
2015-02-20 · Gulf of Mexico, United States · None · 1 aircraft · Status: Completed
Airport HUM
Current FAA registration · N802SM
- Make / Model
- AGUSTA AEROSPACE CORP AW119 MKII
- Seats / Engines
- 8 seats · 1 engine
- ADS-B equipped
- Yes — Mode-S AAEAE7
Source: FAA Aircraft Registry (releasable master file).
Aircraft involved
Probable cause & findings
The fracture of the tail rotor pitch change link due to excessive bearing rotational friction, which resulted from the bearings being installed in exceedance of the maximum allowable torque during the last overhaul of the pitch change link.
Factual narrative
On February 20, 2015, about 0750 central standard time, an Agusta A119 Mk II helicopter, N802SM, experienced an abrupt, uncommanded left yaw during cruise flight over the Gulf of Mexico. The pilot and passenger were not injured. The helicopter sustained substantial damage. The helicopter was registered to and operated by Era Helicopters LLC., under the provisions of 14 Code of Federal Regulations Part 135 as an on-demand air taxi flight. Visual meteorological conditions prevailed for the flight which operated on a company visual flight rules flight plan. The flight departed the Houma-Terrebonne Airport (HUM), Houma, Louisiana, at 0720 and was en route to an off-shore platform.After the uncommanded left yaw, the pilot returned to HUM and performed a run-on landing. A post-flight inspection of the helicopter revealed one of the tail rotor pitch change links (PCL) was fractured. While no further damage was sustained to any helicopter components, the fractured pitch change link had an adverse effect on the helicopter's flight characteristics and required replacement meeting the definition of substantial damage. The tail rotor pitch change link (PCL) assembly comprises a single-piece cast aluminum body with two circular ends, each end containing a spherical bearing. The PCL end connected to the tail rotor blade contains the larger of the two spherical bearings, and is identified as the "large bearing" in this report. The PCL end connected to the tail rotor pitch change mechanism is identified as the "small bearing" in this report. A review of maintenance documentation found that the fractured PCL was overhauled by Precision Heliparts (PHP) and issued an authorized release certificate on December 8, 2014. It was installed on N802SM on February 13, 2015. The fractured pitch link failed at 14.8 flight hours since overhaul and 1,129.8 of total flight hours. Representatives from the National Transportation Safety Board (NTSB), AgustaWestland, PHP, Era Helicopters, and the Federal Aviation Administration convened at Agusta Westland facilities in Philadelphia, Pennsylvania to evaluate the bearing friction for the tail rotor PCLs. The method of inspecting PCL bearing rotational torque was found in the maintenance manual (MM) and overhaul manual (OM). The earlier version of the OM, dated November 25, 2012, differed from the more recent version of the OM, dated November 10, 2014. The 2012 version of the OM required rotational torque inspection by rotating the inspection tool, a 100 millimeter (mm) lever arm, about the axis of the bearing bolt hole, while the 2014 version of the OM required the inspection tool to be rotated away from the axis of the bearing bolt hole. This revision changed the bearing staking procedure. The bearing replacement procedures between the 2012 and 2014 versions of the OM remained the same. AgustaWestland identified the 2012 version of the OM contained the correct bearing rotational torque inspection method. PHP identified they had used the 2014 version of the bearing rotational torque inspection method. During the postaccident examination of the accident PCL, the 2012 and the 2014 inspection procedures were used to measure rotational torque. Both the large and small bearings of fractured PCL exceeded the maximum allowable bearing rotational torque either measured with 2012 and 2014 procedure. For the fractured PCL, the 2012 inspection method consistently returned a higher rotational torque value than the 2014 inspection method. The fractured PCL was examined by the NTSB Material Laboratory. The fracture surface exhibited evidence of fatigue that originated at a raised dash that was part of the part number marking on the PCL. The materials laboratory characterized fatigue cracking across 60% to 70% of the fracture cross section. For additional details on the materials laboratory examination see the Materials Laboratory Factual Report in the docket for this investigation. On March 4, 2015, the FAA issued emergency airworthiness directive (EAD) No. 2015-05-52 for owners and operators of certain A109-series and AW119-series helicopters to inspect PCL part number 109-0130-05-117 for freedom of movement, corrosion, excessive friction of the spherical bearings, and cracks. FAA EAD No. 2015-05-52 was prompted by European Aviation Safety Agency (EASA) issuance of EASA EAD No. 2015-0035-E on February 27, 2015. According to AgustaWestland and the FAA, there have been no reports to date of tail rotor PCL spherical bearings exhibiting excessive friction after inspection directed via the aforementioned FAA and EASA EADs. Based on the findings of this investigation, AgustaWestland had corrected the figure in the replacement procedures to display the correct method of inspecting spherical bearing rotational torque. Additionally, the PCL bearing replacement procedures were removed from the MM and are now found only within the OM. The commercial pilot was conducting an on-demand air taxi helicopter flight. The pilot reported that, while in cruise flight over water, the helicopter experienced an abrupt, uncommanded left yaw. The pilot returned to the departure airport and performed a run-on landing. A postflight examination of the helicopter revealed that one of the tail rotor pitch change links (PCL) was fractured. A review of maintenance records revealed that the fractured PCL had recently been overhauled and installed on the helicopter and that it failed 14.8 flight hours since overhaul. Examination of the PCL revealed that it had fractured due to undetected fatigue cracking that appeared to be the result of bending loads caused by stiff bearings. The stiffness was likely the result of the lack of control of the bearing replacement process. The PCL bearing replacement procedures, which incorporated rotational torque inspection and bearing staking procedures, were contained in the overhaul manual; these procedures were revised about 3 months before the accident, and the overhaul facility used the revised procedures during the replacement of the PCL. Examination of the PCL revealed that both of the bearings exceeded the maximum allowable rotational torque by at least two times the maximum allowed. Based on the findings of this investigation, the PCL manufacturer corrected the figure in the PCL replacement procedures to display the correct method of inspecting spherical bearing rotational torque. Source: NTSB Aviation Accident Database Retrieved: 2026-02-12
NTSB Findings
FAA avdata. C = Cause, F = Factor.
- C Aircraft-Aircraft propeller/rotor-Tail rotor-(general)-Incorrect service/maintenance - C
- C Aircraft-Aircraft propeller/rotor-Tail rotor-(general)-Failure - C
- — Personnel issues-Task performance-Maintenance-Repair-Other/unknown
- — Organizational issues-Support/oversight/monitoring-Documentation/record keeping-Maintenance records-Manufacturer
Verbatim from NTSB's published report. Source file
NTSB_2015_CEN15LA156.txt.
Findings + structured fields enriched from FAA avall.mdb.
Full investigation docket on
data.ntsb.gov ↗.
Search this event elsewhere
External sources are reported, not agency: signal that something happened, not fact about what happened.
- TallyAero Live Wire Aviation press
- NTSB CAROL Agency ↗
- NTSB Docket Agency ↗
- Aviation Safety Network Aviation press ↗
- Kathryn's Report Aviation press ↗
- Aviation Herald Aviation press ↗
- AVweb Aviation press ↗
- Pilots of America Community ↗
- Reddit /r/flying Community ↗
- FlightAware Aviation press ↗
- AOPA accident database Aviation press ↗
- Google News News ↗
- DuckDuckGo News ↗
Related research
Matched on aircraft type or causal vocabulary (stall, maintenance). All research papers
- Embry-Riddle Scholarly Commons 2023 · Conference paper The Value of Strong Partnerships to Build a Successful Aviation Maintenance Career Pathway Program for Transitioning Military Service Members
The aerospace industry is competing with other industries for a qualified workforce, and many of those competing industries are investing heavily in creating workforce development pipelines.
- Embry-Riddle Scholarly Commons 2026 · Journal article (IJAAA) From Reactive to Predictive: A hybrid Trust-Mediated Adoption Framework for Data-Driven Maintenance in Distributed-Authority Aviation Environments
Modern aviation maintenance operates within increasingly data-intensive technological environments, yet the operational integration of predictive maintenance into routine decision-making remains incon…
- NASA NTRS 2026 · Conference Paper Computational Analysis of Steady State Aerodynamics of Transonic Truss-Braced Wing Configuration in Deep Stall
This study presents a computational investigation of steady state aerodynamics of the Subsonic Ultra-Green Aircraft Research (SUGAR) Transonic Truss-Braced Wing (TTBW) configuration over a wide range …
- Semantic Scholar 2026 · Article (Reliability Engineering & System Safety) Understanding human error in military aviation maintenance: The role of Performance shaping factors, cognitive workload and error orientation
- Semantic Scholar 2025 · Article (Applied Sciences) Decision-Making Framework for Aviation Safety in Predictive Maintenance Strategies
The implementation of predictive maintenance (PM) in aviation presents unique challenges due to strict safety requirements, complex operational environments, and regulatory constraints.
- Semantic Scholar 2024 · Article (Defence Science Journal) Modelling of Human Factors in Aviation Maintenance Using HFACS ME Human Factors Analysis and Classification System Maintenance Extension and Bayesian Network
Aircraft maintenance is a complex task involving a skilled human workforce, spare parts, and various other resources. Human factors are an inherent element of the human workforce.