NTSB CAROL · Event
Event LAX02IA013
Registry · N959SD
FAA Aircraft Registry record.
Make / Model
JUST AIRCRAFT LLC JA30 SUPERSTOL
Year of manufacture
2015
Engine
ROTAX 912ULS SERIES (100 hp)
Seats / Engines
2 seats · 1 engine
Last airworthiness date
20151221
ADS-B equipped
Yes — Mode-S AD57AA
Registrant of record
VOROSMARTHY LES DBA
Source: FAA Aircraft Registry (releasable master file).
Aircraft involved
Probable cause & findings
The fatigue failure of a 5/16-inch boom attach bolt was most probably caused by the angular misalignment between the tail boom bolt hole and the fuselage mounted nutplate.
Factual narrative
On October 22, 2001, about 1700 hours Pacific daylight time, a MDHI 600N helicopter, N959SD, operated by the Los Angeles County Sheriff's Department, was found to have a fractured tail boom attach bolt during a preflight examination by a pilot. A routine ground examination of the helicopter was being performed prior to evening ground standby duty from the Sheriff's Aerobureau in Long Beach, California. The pilot stated that as he pushed sideways on the tail boom it seemed loose. Subsequent examination by maintenance personnel found that the head half of the upper right 5/16-inch tail boom attach bolt was hanging loose by the safety wire. Examination of the bolt revealed that it had failed about three threads from the bolt shank. The remainder of the threaded portion of the bolt remained in the plate nut affixed to the fuselage. Fretting was observed on the fuselage and tail boom mating points in proximity to the fractured bolt. Areas of the bolt shank exhibited polishing. Subsequent examination for collateral damage revealed cracks were present at the aluminum attach fitting and associated angles. The operator examined two of their other 600N helicopters and found those with cracks at the same location. Two other local area law enforcement operators also found cracks in the same location. According to the Federal Aviation Administration (FAA) Aircraft Certification Offices responsible for certifying the 600N, a service bulletin and a priority letter airworthiness directive are in process. The tail boom is attached to the fuselage with four special OEM produced bolts. The helicopter tail boom is required to be removed every 300 flight hours for inspection, and, in addition, is occasionally removed for other servicing procedures. Examination of the maintenance records disclosed that the bolts may have been through about 10 torque cycles. The bolts have no life limit. The failed 5/16-inch bolt, p/n HS5482-5-18, is torqued to 150-inch/pounds during installation. On November 2, 2001, MDHI issued service bulletin SB600N-036, which prescribes procedures for inspecting the upper right tail boom, attach bolt, and attach fitting assembly. "The Part 1 inspection requirements of this bulletin shall be accomplished within the next five (5) hours of helicopter operation after the receipt of this bulletin or within thirty (30) days of the issue date of this bulletin, whichever occurs first." "The Part 2 inspection and repair requirements of this bulletin shall be accomplished within the next twenty-five (25) hours of helicopter operation after the receipt of this bulletin or within ninety (90) days of the issue date of this bulletin, whichever occurs first." On November 28, 2001, the FAA issued Priority Letter Airworthiness Directive (Emergency AD) 2001-24-51, mandating compliance with the service bulletin 600N-036. A MDHI 600N helicopter, operated by the Los Angeles County Sheriff's Department, was found to have a fractured tail boom attach bolt during a routine ground examination of the helicopter for evening ground standby duty. The pilot stated that as he pushed sideways on the tail boom it seemed loose. Subsequent examination by maintenance personnel found that the head half of the upper right 5/16-inch tail boom attach bolt was hanging loose by the safety wire. Examination of the bolt revealed that it had failed about three threads from the bolt shank. The remainder of the threaded portion of the bolt remained in the plate nut affixed to the fuselage. Fretting was observed on the fuselage and tail boom mating points in proximity to the fractured bolt. Areas of the bolt shank exhibited polishing. Subsequent examination for collateral damage revealed cracks were present at the aluminum attach fitting and associated angles. The operator examined two of their other 600N helicopters and found those with cracks at the same location. Two other local area law enforcement operators also found cracks in the same location. The tail boom is attached to the fuselage with four special OEM produced bolts. The helicopter tail boom is required to be removed every 300 flight hours for inspection, and, in addition is occasionally removed for other servicing procedures. Examination of the maintenance records disclosed that the bolts may have been through about 10 torque cycles. The bolts have no life limit. The failed 5/16-inch bolt, p/n HS5482-5-18, is torqued to 150-inch/pounds during installation. On November 2, 2001, MDHI issued service bulletin SB600N-036, which prescribes procedures for inspecting the upper right tail boom, attach bolt, and attach fitting assembly. "The Part 1 inspection requirements of this bulletin shall be accomplished within the next five (5) hours of helicopter operation after the receipt of this bulletin or within thirty (30) days of the issue date of this bulletin, whichever occurs first." "The Part 2 inspection and repair requirements of this bulletin shall be accomplished within the next twenty-five (25) hours of helicopter operation after the receipt of this bulletin or within ninety (90) days of the issue date of this bulletin, whichever occurs first." On November 28, 2001, the FAA issued Priority Letter Airworthiness Directive (Emergency AD) 2001-24-51, mandating compliance with the service bulletin 600N-036. Source: NTSB Aviation Accident Database (Pre-2008 Archive) Retrieved: 2026-02-12
Verbatim from NTSB's published report. Source file
NTSB_2001_LAX02IA013.txt.
Findings + structured fields enriched from FAA avall.mdb.
Full investigation docket on
data.ntsb.gov ↗.
Beyond the agency record
Search this event elsewhere.
Pre-filled searches into the sources where news + community discussion of aviation events lives. External sources are reported, not agency. Treat them as signal that something happened, not as fact about what happened.
Entity-clustered aviation events in the press — last 24 hr + 30-day archive.
Official agency record + docket.
Investigative docket: factual reports, photos, transcripts.
Long-running aviation incident database (Flight Safety Foundation).
Community NTSB synthesis blog — often has photos and witness reports.
Gold-standard aviation incident blog.
Aviation industry news search.
GA pilot forum — informed but rumor-prone.
GA pilot subreddit search.
Tail-number page — flight history (free tier limited).
AOPA Air Safety Institute search.
Mainstream press coverage. Recent events only.
Privacy-preserving news search.
External links open in a new tab. We don't ingest their content; we deep-link search queries.
Related research
What the literature says.
Academic papers and agency reports matching this event's aircraft type or causal vocabulary (icing, stall, maintenance). Sourced from NASA NTRS, NTSB Safety Studies, FAA CAMI, AOPA Air Safety Institute, Embry-Riddle Scholarly Commons, arXiv, and the Semantic Scholar academic graph.
- Embry-Riddle Scholarly Commons 2023 · Faculty research project
Reconfigurable Guidance and Control Systems for Emerging On-Orbit Servicing, Assembly, and Manufacturing (OSAM) Space Vehicles
Dynamic response to emergent situations is a necessity in the on-orbit servicing, assembly, and manufacturing (OSAM) field, because traditional on-orbit guidance and control (G&C) cannot respond effic…
- arXiv 2023 · arXiv preprint
Variation of Critical Crystallization Pressure for the Formation of Square Ice in Graphene Nanocapillaries
Two-dimensional square ice in graphene nanocapillaries at room temperature is a fascinating phenomenon and has been confirmed experimentally.
- Embry-Riddle Scholarly Commons 2023 · Conference paper
The Value of Strong Partnerships to Build a Successful Aviation Maintenance Career Pathway Program for Transitioning Military Service Members
The aerospace industry is competing with other industries for a qualified workforce, and many of those competing industries are investing heavily in creating workforce development pipelines.
- arXiv 2022 · arXiv preprint
Enhanced Prediction of Three-dimensional Finite Iced Wing Separated Flow Near Stall
Icing on three-dimensional wings causes severe flow separation near stall. Standard improved delayed detached eddy simulation (IDDES) is unable to correctly predict the separating reattaching flow due…
- NASA NTRS 2019 · Contractor Report (CR)
An Evaluation of an Analytical Simulation of an Airplane with Tailplane Icing by Comparison to Flight Data
This report presents the assessment of an analytical tool developed as part of the NASA/FAA Tailplane Icing Program. The analytical tool is a specialized simulation program called TAILSM4 which was de…
- NASA NTRS 2019 · Technical Publication (TP)
NASA/FAA Tailplane Icing Program: Flight Test Report
This report presents results from research flights that explored the characteristics of an ice-contaminated tailplane using various simulated ice shapes attached to the leading edge of the horizontal …
Browse the full corpus — academia portal ↗