NYC95LA005
1994-10-07 · GRT BARRINGTON, Massachusetts, United States · None · 1 aircraft · Status: Completed
Airport GBR
Aircraft involved
Probable cause & findings
the pilot's improper flare during landing, which resulted in a hard landing and the subsequent collapsed landing gear. A factor in this accident was the pilot's lack of total recent flying experience and recent experience in make and model.
Factual narrative
On October 7, 1994, at 1115 eastern daylight time, a Piper PA-28-140, owned by Great Barrington Enterprise, Inc., and piloted by Henry S. Rossire, was substantially damaged while landing at the Great Barrington Airport, Great Barrington, Massachusetts. The pilot was not injured. Visual meteorological conditions prevailed and no flight plan had been filed for the flight operating under 14 CFR 91. The pilot reported that he had planned to stay in the airport traffic pattern and practice takeoff and landings. This was his first approach to a landing. In the 6120.1/2, the pilot stated: "...Weather clear, wind calm, practicing landings and takeoffs on Runway 11...After reviewing accident site I have determined that the aircraft was in a too low position for the approach to Runway 11. The main gear struck the embankment and the right side [landing gear] was torn off the aircraft. The aircraft slid off the right side of the runway, stopped in the grass about 50 yards from the threshold..." In the Federal Aviation Administration (FAA) Inspector's report, he stated: "...The pilot landed short of the runway asphalt by about 3 feet. There was a rut about 6 inches deep and 2 1/2 to 3 feet long that was caused by the right main wheel as it contacted the ground. There was slight evidence of the left main wheel touching the ground at about the same time. The airplane apparently bounced back into the air. The next indication of impact with the ground was located about 30 feet away on the runway asphalt...There was an indication of the main landing gear sliding for a short distance when it apparently collapsed enough to cause the airplane to be supported on the right wing tip...the airplane left the runway and continued to slide on the turf or grass along side of the runway..." The 80 year old pilot's total flight time for the previous 90 days consisted of 2 hours of pilot-in-command in another make and model airplane. THE PILOT HAD PLANNED TO STAY IN THE AIRPORT TRAFFIC PATTERN AND PRACTICE TAKEOFFS AND LANDINGS. DURING HIS FIRST APPROACH TO LAND, THE AIRPLANE LANDED HARD, BOUNCED ONCE, AND LANDED A SECOND TIME WHEN THE RIGHT MAIN LANDING GEAR COLLAPSED. THE PILOT'S TOTAL FLIGHT TIME FOR THE PREVIOUS 90 DAYS CONSISTED OF 2 HOURS OF PILOT-IN-COMMAND IN ANOTHER MAKE AND MODEL AIRPLANE. Source: NTSB Aviation Accident Database (Pre-2008 Archive) Retrieved: 2026-02-12
Verbatim from NTSB's published report. Source file
NTSB_1994_NYC95LA005.txt.
Findings + structured fields enriched from FAA avall.mdb.
Full investigation docket on
data.ntsb.gov ↗.
Search this event elsewhere
External sources are reported, not agency: signal that something happened, not fact about what happened.
- TallyAero Live Wire Aviation press
- NTSB CAROL Agency ↗
- NTSB Docket Agency ↗
- Aviation Safety Network Aviation press ↗
- Kathryn's Report Aviation press ↗
- Aviation Herald Aviation press ↗
- AVweb Aviation press ↗
- Pilots of America Community ↗
- Reddit /r/flying Community ↗
- FlightAware Aviation press ↗
- AOPA accident database Aviation press ↗
- Google News News ↗
- DuckDuckGo News ↗
Related research
Matched on aircraft type or causal vocabulary (icing). All research papers
- arXiv 2026 · arXiv preprint Enabling Beyond-Visual-Line-of-Sight Drones Operation over Open RAN 5G Networks with Slicing
Among the foretold claims of the transition from 5G to 6G, Beyond-Visual-Line-of-Sight (BVLoS) drone operation has emerged as a prominent Internet-of-Robots enabler.
- NASA NTRS 2026 · Contractor Report (CR) Icing Physics Studies Using the 3D SIDRM Test Article: 2023 Icing Tests Analysis
In-flight icing is an important safety issue and is a factor that affects aircraft design and performance. Newer regulations are driving a need for improvements in airframe and engine icing simulation…
- arXiv 2025 · arXiv preprint Multi-Agent Deep Reinforcement Learning for UAV-Assisted 5G Network Slicing: A Comparative Study of MAPPO, MADDPG, and MADQN
The growing demand for robust, scalable wireless networks in the 5G-and-beyond era has led to the deployment of Unmanned Aerial Vehicles (UAVs) as mobile base stations to enhance coverage in dense urb…
- NASA NTRS 2025 · Presentation NASA Icing Update – March 2025
This NASA Icing Update was prepared for presentation to the SAE International AC-9C Inflight Icing Technology Committee. This update includes the following topics: planned Rotational Icing Scaling tes…
- Embry-Riddle Scholarly Commons 2025 · Journal article (JAAER) A Mathematical Model on the Temporal Dynamics of Aviation Competitive Pricing
This study investigates the competitive dynamics of airport pricing using U.S. airport data to validate the findings. It employs linear and nonlinear ordinary differential equation models to analyze t…
- arXiv 2024 · arXiv preprint An energy-stable phase-field model for droplet icing simulations
A phase-field model for three-phase flows is established by combining the Navier-Stokes (NS) and the energy equations, with the Allen-Cahn (AC) and Cahn-Hilliard (CH) equations and is demonstrated ana…