FAA · Type Certificate Data Sheet
TCDS A21NM
Construcciones Aeronauticas S.A.
Models covered (5)
Certification basis — 14 CFR
Specific sections
- Sec. 21.29
- Sec. 25.57
- Sec. 21.101
- Sec. 25.103
- Sec. 25.351
- Sec. 25.365
- Sec. 25.562
- Sec. 25.571
- Sec. 25.723
- Sec. 25.905
- Sec. 25.1149
- Sec. 25.1305
- Sec. 25.1316
- Sec. 25.1419
Former holders
- Construcciones Aeronauticas\S.A.
- CFR Part 21\CFR Part 25\CFR Part 36\CFR Part 26
- Construcciones Aeronauticas, S.A.
Fleet view · 3 registered tails
Engineering specs aggregated from the FAA Aircraft Registry — what every actually-flying tail under this TCDS reports. Median + 10th–90th-percentile range across the active fleet.
Seats
2
n=3
Horsepower
2,645
n=2
Year of mfr
2019
2019–2019
Engines on the type, by tail count
- P&W CANADA PW127G 2
NTSB events
0
across all model variants
Applicable ADs
36
FAA airworthiness directives
Per-tail rate
0.00 events / tail · 12.00 ADs / tail
The TCDS PDF on drs.faa.gov is the authoritative document for design-as-certified weight limits, performance, equipment, AD compliance times, and operating limitations. Open on drs.faa.gov ↗ DRS frequently breaks — when it does, the fleet view above and the cross-links below are usually what you actually need.