Skip to content

Atlas / TCDS / H6SO

FAA · Type Certificate Data Sheet

TCDS H6SO

Southwest Florida Aviation International

Historical Aircraft Rotorcraft Rev 7 09/18/1996 drs.faa.gov ↗

Special Airworthiness Information Bulletins (2)

Advisory bulletins on these airframes. Not mandatory like ADs — but operators tracking AD compliance often miss the SAIB on the same component.

  • SW-18-29R1 Rotorcraft Tail Boom, Attach Structure Failure
  • SW-12-38 Emergency Push Out Window Retention

Certification basis — 14 CFR

Specific sections

  • Sec. 36.1
  • Sec. 133.1
  • Sec. 137.3
  • Sec. 21.25
  • Sec. 29.15
  • Sec. 21.101
  • Sec. 91.313
  • Sec. 29.1529

Former holders

  • Southwest Florida Aviation

The TCDS PDF on drs.faa.gov is the authoritative document for design-as-certified weight limits, performance, equipment, AD compliance times, and operating limitations. Open on drs.faa.gov ↗ DRS frequently breaks — when it does, the fleet view above and the cross-links below are usually what you actually need.