Atlas / eCFR / Subchapter C / Part 420
14 CFR · Part 420
LICENSE TO OPERATE A LAUNCH SITE
Authority
51 U.S.C. 50901-50923.
Source
Docket No. FAA-1999-5833, 65 FR 62861, Oct. 19, 2000, unless otherwise noted.
Subpart A — General
4 sections
Subpart B — Criteria and Information Requirements for Obtaining a License
11 sections
- § 420.15 § 420.15 Information requirements. ↗
- § 420.17 § 420.17 Bases for issuance of a license. ↗
- § 420.19 § 420.19 Launch site location review—general. ↗
- § 420.21 § 420.21 Launch site location review—launch site boundary. ↗
- § 420.23 § 420.23 Launch site location review—flight corridor. ↗
- § 420.25 § 420.25 Launch site location review—risk analysis. ↗
- § 420.27 § 420.27 Launch site location review—information requirements. ↗
- § 420.29 § 420.29 Launch site location review for unproven launch vehicles. ↗
- § 420.30 § 420.30 Launch site location review for permitted launch vehicles. ↗
- § 420.31 § 420.31 Agreements. ↗
- § 420.32-420.40 §§ 420.32-420.40 [Reserved] ↗
Subpart C — License Terms and Conditions
5 sections
Subpart D — Responsibilities of a Licensee
13 sections
- § 420.51 § 420.51 Responsibilities—general. ↗
- § 420.53 § 420.53 Control of public access. ↗
- § 420.55 § 420.55 Scheduling of launch site operations. ↗
- § 420.57 § 420.57 Notifications. ↗
- § 420.59 § 420.59 Mishap plan. ↗
- § 420.61 § 420.61 Records. ↗
- § 420.63 § 420.63 Explosive siting. ↗
- § 420.65 § 420.65 Separation distance requirements for handling division 1.1 and 1.3 explosives. ↗
- § 420.66 § 420.66 Separation distance requirements for storage of hydrogen peroxide, hydrazine, and liquid hydrogen and any incompatible energetic liquids stored within an intraline distance. ↗
- § 420.67 § 420.67 Separation distance requirements for handling incompatible energetic liquids that are co-located. ↗
- § 420.69 § 420.69 Separation distance requirements for co-location of division 1.1 and 1.3 explosives with liquid propellants. ↗
- § 420.70 § 420.70 Separation distance measurement requirements. ↗
- § 420.71 § 420.71 Lightning protection. ↗
Appendices & SFARs
- App Appendix A to Part 420—Method for Defining a Flight Corridor ↗
- App Appendix B to Part 420—Method for Defining a Flight Corridor ↗
- App Appendix C to Part 420—Risk Analysis ↗
- App Appendix D to Part 420—Impact Dispersion Areas and Casualty Expectancy Estimate for an Unguided Suborbital Launch Vehicle ↗
- App Appendix E to Part 420—Tables for Explosive Site Plan ↗
Recent Federal Register activity
The last 25 of 19 Federal Register documents that touch 14 CFR Part 420, newest first.
- 2021-03-09RuleStreamlined Launch and Reentry License RequirementsRead →
- 2020-12-10RuleStreamlined Launch and Reentry License RequirementsRead →
- 2019-07-22NPRMStreamlined Launch and Reentry Licensing Requirements; Notice of Availability and Extension of Comment PeriodRead →
- 2019-05-31NPRMStreamlined Launch and Reentry Licensing Requirements; Extension of Comment PeriodRead →
- 2019-04-15NPRMStreamlined Launch and Reentry Licensing RequirementsRead →
- 2018-06-20RuleUpdates to Rulemaking and Waiver Procedures and Expansion of the Equivalent Level of Safety OptionRead →
- 2016-07-20RuleChanging the Collective Risk Limits for Launches and Reentries and Clarifying the Risk Limit Used To Establish Hazard Areas for Ships and AircraftRead →
- 2016-06-01NPRMUpdates to Rulemaking and Waiver Procedures and Expansion of the Equivalent Level of Safety OptionRead →
- 2013-01-08RuleExplosive Siting Requirements; CorrectionRead →
- 2012-09-07RuleExplosive Siting RequirementsRead →
- 2012-04-05RuleCorrection of Authority Citations for Commercial Space TransportationRead →
- 2011-02-16NPRMExplosive Siting RequirementsRead →
- 2008-12-04RuleRequirements for Amateur Rocket ActivitiesRead →
- 2007-04-06RuleExperimental Permits for Reusable Suborbital RocketsRead →
- 2006-08-31RuleMiscellaneous Changes to Commercial Space Transportation RegulationsRead →
- 2006-03-31NPRMExperimental Permits for Reusable Suborbital RocketsRead →
- 2005-05-19NPRMMiscellaneous Changes to Commercial Space Transportation RegulationsRead →
- 2000-10-19RuleLicensing and Safety Requirements for Operation of a Launch SiteRead →
- 1999-06-25NPRMLicensing and Safety Requirements for Operation of a Launch SiteRead →